Love Solar Case Studies

Case Study - St Bees Cumbria

Installation location: St Bees-Cumbria
Installation Date: March - 2011
Module Type: Romag SMT 180Wp
System Size: 3.2KWp
Estimated Annual Output: 3.2KWp

Testimonial:

The instant my solar PV system got switched on my electricity meter stopped turning, despite having all our standard electrical appliances on, I was still getting paid 41.3p per unit- if I didn’t know better I would say it was almost too good to be true!